Step 3 Creating a Moisture Map, Points and Dry Standards

Step 3 - Creating a Moisture Map, adding moisture points and Dry Standards

  1. Add a sketch to serve as a moisture map to plot the moisture points and equipment placement.
    1. You can use an existing sketch in the file or create a new one or use a photo as the backdrop for the moisture map.
  2. Use the place button and drag a moisture point on to the moisture map. Next, select room, the material being measured and enter the readings for the moisture point.
  3. Add the reading for the dry standard of the material.
  4. Repeat this process for each room.